Nifty  21861.50  -134.35  (-0.61%)

Sensex  71922.20  -566.79  (-0.78%)

USDINR  83.53  0.00  (0.00%)

NTPC declares commercial operations of Unit 1 of Gadarwara Super Thermal Power Station
(29 Apr 2019)
NTPC announced that Unit #1 of 800 MW of Gadarwara Super Thermal Power Station (2 x 800 MW) will be declared on commercial operation w.e.f 00:00 Hrs of 30 April 2019.

With this, the commercial capacity of Gadarwara Super Thermal Power Station, NTPC and NTPC group would become 800 MW, 46525 MW and 53666 MW respectively.