NTPC announced that Unit 1 of 660MW of Stage II of Tanda Super Thermal Power Station (2x660 MW) and Unit 1 of 660MW of Khargone Super
Thermal power Station (ZXGSOMW) have been added to the Installed Capacity of NTPC.
With this, the total installed capacity of NTPC and NTPC group has become 48645 MW and 57106
MW respectively.